Equipment combination from plan source
Integrated filling, case packing & palletizing
This route covers equipment stages from filling through case packing and palletizing for new private-label or co-packing lines and end-of-line expansion. Product, pack, and existing interfaces determine retained and added stages.
For a new line or an end-of-line expansion, put filling, closing, labeling, case handling, and palletizing on one rate and interface map.
Route overview
Select a station to see how this route is arranged.
This overview is generated from the CAD station order and arrangement for this plan. It supports project discussion and does not replace an engineering drawing.
Route field clip
See one field stage related to this route.
This clip helps identify one equipment stage only. The actual combination still depends on this route, the pack, and site interfaces.
Discuss this routeStation sequence
See this route as the source lists its stations.
The names and order below come from the plan source and support route comparison. Whether stages stay, are added, or are replaced still depends on the product, pack, and site interfaces.
Bottle-to-pallet combination
01
Bottle infeed conveyor
02
Ionized-air bottle rinser
03
UV tunnel
04
Six-head filling machine
05
Gas-injection unit
06
Capping machine
07
Foil-sealing unit
08
Can-seaming unit
09
Double-side labeler
10
Coding unit
11
Accumulation platform
12
Case erector
13
Collaborative case-packing robot
14
Case sealer
15
Industrial palletizing robot
Bucket weighing combination (second source configuration)
01
Six-head bucket weighing filler
02
Servo capping machine
03
Double-side labeler
04
Industrial palletizing robot
CAD layout
Review the layout separately
The layout keeps its original aspect ratio and is not used as decoration. Open it separately to inspect dimensions, direction, and equipment positions; it supports a layout discussion and is not a final site drawing.
Open the CAD layout
Only the actual combination, buffers, and site conditions show how the stages should connect; line rate and automation level still need confirming against those conditions.