About CODAPAK: filling and packaging equipment

CODAPAK covers sauce filling equipment, spouted-pouch filling and upgrades to existing packaging lines.

Projects we can discuss

From your task to an equipment configuration

Start with the product, pack and production objective. Compare suitable stages, identify equipment to retain and establish the information needed to check compatibility. Supply scope, operating parameters, trial conditions and the commercial proposal are confirmed for each project.

Using the site materials

Photos, layouts and videos help compare equipment and individual operations. They do not replace trials with your product and packaging. Confirm the selected configuration and scope of work in the proposal before ordering.

Discuss your project

Leave an email address or phone number and a brief description. Include your product, packaging and required stage so the discussion starts with your operation.

Send an inquiry

Sourcing and compliance teams can use the details below for vendor verification. The contracting party named in the equipment supply agreement governs.

Legal entity and manufacturing address
ManufacturerПроизводственная компания «Ляонин Чуандэ Машинери Эквипмент»
Manufacturing address№ 28B, зона Гуй 1, Индустриальный парк Тайпиньян, Демонстрационная зона Шэньфу, провинция Ляонин, Китай
Unified Social Credit Code912104000517988763A registration identifier issued in China. This is a non-resident manufacturer, so no Russian INN / OGRN exists.
Founded2012
Registered capitalCNY 5,000,000

If the group operates a Russian representative office or contracts through a Russian LLC, list its INN / OGRN / KPP here — Russian buyers and search engines weight in-country entity data more heavily.

Production and assembly site

The map indicates the area of the production and assembly site. Visits and audits by appointment.

Cooperation, installation and after-sales terms

The steps below follow the sequence of an industrial purchase, so engineering and procurement can reference them directly during internal approval.

01Consultation and commercial proposalIt starts from your product and pack, not from an equipment list.

First we establish the material state: viscosity and working temperature, whether particles are present, foaming or stringing behaviour, and the state after a stop. Second, the real pack: container opening, closure type, label surface and changeover difficulty. Only then do equipment scope and line rate follow.

Once product and pack samples are in hand we issue a technical and commercial proposal with equipment scope, stage interfaces, floor area and the boundary of supply, together with the items still open on your side.

If samples or operating data are incomplete, we record them as open questions instead of filling the proposal with assumed values.

02Payment termsStaged payments, with machine performance verified on your product before shipment.

The customary structure for this class of project is an advance payment after contract signature to start production, shipment after the equipment is completed and verified on your product and pack, and the balance settled at the milestone agreed in the contract.

Pre-shipment verification covers dosing accuracy on your product, seal quality, coding and labelling results, and changeover time, with a traceable record.

Exact percentages, milestones, acceptance method and retention are set out in the contract annex; this page does not replace them.

03Installation and commissioningOur engineers can supervise positioning, connection and line integration at your site.

We provide on-site supervision for installation and commissioning: positioning and levelling to the layout, assembly of machines and conveyor links, interface connection with existing equipment upstream and downstream, and confirmation of utilities (power, air, water, steam).

Commissioning includes dry and product runs, rate verification and changeover drills, with key parameters recorded in the acceptance document.

Operators and maintenance staff are trained, and operating, cleaning and routine maintenance points are handed over.

04Warranty, spare parts and technical supportWarranty scope is fixed in the contract; spares and engineering support remain available.

Warranty period and scope are set by the contract; failures attributable to the equipment itself are handled by the supplier during that period.

Wear and replacement parts — nozzles, dosing components, sealing and capping parts, guides, changeover tooling — are listed per project and can continue to be supplied after the warranty period.

Remote technical support (photos, video, parameter records) and on-site service where required. We recommend archiving the parameters and records needed for troubleshooting at acceptance.

Configuration, price, lead time and acceptance criteria are governed by the project-specific technical and commercial proposal and the contract. This page does not replace contract terms.